About the job

ANTS were contracted to undertake the pipework installation for the ground source system at the New Bucking gate building. ANTS installed 3 sets of manifolds in separate locations and carried out the header pipework to plantroom termination points.

ANTS then carried out the system flushing and filling to all pipework.