About the job
Connection of geothermal boreholes, back to header pipework and termination in plantroom.
ANTS were contracted to do all works including pipework insulation and system flushing.
Geothermal boreholes were drilled below the building slab and pipework was taken up the sheet piles and into the basement level of the building.