Renewables Case study

Buckingham Gate

About the job

Bāri ANTS were contracted to undertake the pipework installation for the ground source system at the New Bucking gate building. ANTS installed 3 sets of manifolds in separate locations and carried out the header pipework to plantroom termination points.