About
ANTS successfully drilled a pair of Open Loop boreholes for a ground source system on the Alder Hey Hospital site in Liverpool.
Installing 339mm diameter casing down into competent rock at circa 25m to allow a 311mm finished borehole to be completed at 150m on each well.
Upon completion of the drilling phase of works ANTS then completed the pump testing regime in line with the Environment Agency consent.